Earthquake 6014V Manuel d'utilisateur Page 14

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 28
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 13
OPERATOR INSTRUCTIONS AND PARTS
CRT Models 6014V
Page 14
GetEarthquake.com
800-345-6007
SERVICING THE ROTOTILLER
The following information will help you make the necessary checks
and perform the procedures required to follow the normal care
recommendations made for your rototiller unit.
If you prefer, your local authorized dealer can make these checks and
perform the required procedures for you.
To prevent accidental starting:
Engine must be turned off and cool, and spark
plug wire must be removed and secured from
spark plug before checking and adjusting engine
or equipment.
MAINTENANCE
MAINTENANCE SCHEDULE
Your rototiller has been designed and produced by the industry’s leading manufacturer of outdoor power equipment to provide you
years of reliable operation.
Keeping your tiller in top running condition will prolong its life, and help you obtain optimum performance.
Please read this normal care schedule, and note the recommended care operating intervals to extend the life of your unit.
Maintenance Operation Page
Before
Each Use
50 hours or
Every Season
Change forward/reverse belt 18 X
Engine maintenance 19 X X
Check or fill engine crankcase 19,EM X 2
Check tiller transmission grease 20 X
Check tire pressure 20 X
Lubrication 20 X
Clean tine axle shaft 20 X
Lubricate wheel axle shaft 21 X
Check throttle control adjustment EM 1
EM = See engine manual
1 Adjust throttle control after first 3 hours of operation or if engine is hard to start or run-on occurs.
2 Change oil after first 5-8 hours of use, then after every 50 hours or every season. Change oil every 25
hours when operating under heavy load or in high temperatures.
WARNING
!
Vue de la page 13
1 2 ... 9 10 11 12 13 14 15 16 17 18 19 ... 27 28

Commentaires sur ces manuels

Pas de commentaire