Earthquake 26750 Manuel d'utilisateur Page 9

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 72
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 8
Check for parts online at www.getearthquake.com or call 800-345-6007 M-F 8-5
9
Operator's Manual
VECTOR Compact Tiller
5. Assemble tine shield extensions using six (6) M6 bolts and six
(6) nylock nuts. SEE FIGURE 4
6. Assemble tines to unit. Sharp edges of tines will be away
from the operator at the top or facedown at front of machine.
Fasten outer tines to the inner tines using the 8mm x 40mm
lock pins already axed to the inner tines. Lock pins must be
installed so that the pin enters the hole in the tine from the
front of the tiller, and so the wire bale hinges over the top of
the tine pipe and latches to the protruding pin on the back
side of the tine. SEE FIGURE 5
7. Install the drag stake assembly from the top down through the
drag stake holder tube on the tiller frame between the wheels.
Lock the drag stake in place using the lock pin that is already
axed to the drag stake holder tube. SEE FIGURE 6
FILL ENGINE CRANKCASE
1. Add oil according to engine manual. Do not overll. Use
a clean, high quality detergent oil. Container must be
marked A.P.I. Service SF - SJ. Use no special additives with
recommended oils. Do not mix oil with gasoline. Oil level
must be full. Check the oil level by removing oil ll plug. Oil
level should be up to the bottom of the ll plug opening.
2. Always check oil level before starting engine. Refer to engine
manual for capacity and type of oil to use.
lock pin
drag stake
drag stake
holder tube
lock pin
FIGURE 4
M6 bolts
tine shield
FIGURE 5
FIGURE 6
lock pin attached correctly
lock pin attached incorrectly
Vue de la page 8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 ... 71 72

Commentaires sur ces manuels

Pas de commentaire